Challenge
Ironwood Industries needed to create a 3-year workforce plan to align with production and financial objectives, increase manufacturing capacity while controlling labor costs, and navigate the complexities of the post-COVID business environment.
Results
By leveraging LYTIQS, Ironwood Industries developed an optimized workforce plan that balanced temporary labor and overtime, resulting in a 10% larger team with nearly the same cost. This reduced the required productivity increase from 13.8% to 4% per FTE.
Key Product
LYTIQS
LYTIQS enabled us to rapidly align our workforce strategies with our operational goals, delivering results in record time.
HR Director
Ironwood Industries
.png?width=500&height=500&name=Private%20Edge%20(6).png)
About Ironwood Industries
Ironwood Industries is a mid-sized manufacturing company that faced challenges in navigating growth and controlling costs, requiring a strategic approach to workforce planning.The Challenge
Ironwood Industries, a mid-sized manufacturing company, faced significant challenges in managing growth and controlling costs. They needed a comprehensive 3-year workforce plan to meet their production and financial goals. Additionally, they sought to increase manufacturing capacity while maintaining tight control over labor costs, all within the context of the complex post-COVID business environment.
The Solution
Ironwood Industries discovered LYTIQS as a potential solution to their workforce planning needs. After evaluating other options, they chose LYTIQS due to its ability to integrate HR, financial, and operational data seamlessly. This decision was influenced by the need for a data-driven strategy to optimize workforce management. 'LYTIQS enabled us to rapidly align our workforce strategies with our operational goals, delivering results in record time,' said the HR Director of Ironwood Industries. With LYTIQS, Ironwood Industries could forecast costs, automate reporting, and develop a balanced approach between temporary labor and overtime.
The Results
The implementation of LYTIQS led to impressive results for Ironwood Industries. They achieved a more efficient workforce cost structure, increasing their team size by 10% at nearly the same cost as the original workforce. The required manufacturing productivity increase per Full-Time Equivalent (FTE) was initially set at 13.8% but was able to be reduced to 4%. Additionally, decision-making time was cut down to under 5 minutes because of the availability of data. These metrics illustrate the substantial impact LYTIQS had on Ironwood Industries' operational efficiency and cost management.